胡家亮,杨彩香,王颖.广东佛山地铁二号线岩土工程勘察分析[J].矿产勘查,2019,(12):3016-3022 |
广东佛山地铁二号线岩土工程勘察分析 |
Investigation and analysis on geotechnical engineering of Foshan Metro Line 2,Guangdong |
投稿时间:2019-06-12 |
DOI: |
中文关键词: 地铁工程 盾构施工 工程地质 勘察技术 |
英文关键词: subway engineering,shield construction,engineering geology,survey technology |
基金项目: |
|
摘要点击次数: 1526 |
全文下载次数: 893 |
中文摘要: |
文章首先结合佛山地区的地质特征来分析佛山地铁二号线建设中的主要工程地质问题,然后利用钻探、原位测试、物探、室内试验等勘察技术来研究地铁沿线区域软土、岩石、地表水及地下水的物理力学性质,最后对佛山地铁二号线一期工程设计、施工、监测等提出合理可行的工程措施建议。 |
英文摘要: |
This paper first analyzes the main engineering geological problems in the construction of Foshan Metro Line 2 by combining the geological features of Foshan area, and then uses drilling, in-situ testing, geophysical exploration, indoor testing and other exploration techniques to study soft soil, rock, and The physical and mechanical properties of surface water and groundwater, and finally put forward reasonable and feasible engineering measures for the design, construction and monitoring of the first phase of Foshan Metro Line 2. |
查看全文
查看/发表评论 下载PDF阅读器 |
关闭 |
|
|
|