翁平,黄斌.伪倾斜房柱法在倾斜薄矿体中的应用[J].矿产勘查,2010,1(3):299-301 |
伪倾斜房柱法在倾斜薄矿体中的应用 |
Application of Pseudo-inclined Room-and-pillar Method in Inclined Thin Orebody |
投稿时间:2009-10-22 |
DOI: |
中文关键词: 伪倾斜房柱法 倾斜 倾斜薄矿体 采矿 |
英文关键词: pseudo-inclined room-and-pillar method inclined thin orebody mining |
基金项目: |
|
摘要点击次数: 2044 |
全文下载次数: 1163 |
中文摘要: |
倾斜薄矿体的回采一直是采矿方法设计上的难点,国内尚无较好的采矿方法可参考。文章介绍了伪倾斜房柱法在浙江良戈舍铁矿的实际应用情况,实践表明:该方法应用于倾斜薄矿体的回采,能很好地解决常规留矿法放矿难和房柱房又不能规范布置电耙的问题,回收率也大有提高,取得了巨大的经济效益。该采矿方法对于其他的缓倾斜薄矿体的开采具有借鉴和推广意义。 |
英文摘要: |
The stoping of inclined thin orebody is a difficulty for mining design .Take Lianggeshe Iron Mine in Zhejiang province, pseudo-inclined room-and-pillar method was introduced in this paper. It is proved that pseudo-inclined room-and-pillar method not only solve the ore drawing in shrinkage method, but scraper arrangement in common room-and-pillar method. Thus it enhanced the recovery rate and got good economic benefit. What’s more, this method also possesses reference meaning in the exploitation of other gentle inclined thin orebody. |
查看全文
查看/发表评论 下载PDF阅读器 |
关闭 |
|
|
|