文章摘要
李国和,高国庆,左程,钟龙,李雷娟,宋盼盼,刘新,陈晓枫.多星协同卫星遥感技术在湖南平江抽水蓄能电站水土保持监管中的应用[J].矿产勘查,2021,12(5):1279-1284
多星协同卫星遥感技术在湖南平江抽水蓄能电站水土保持监管中的应用
Application of multi-satellite collaborative remote sensing technology in water and soil conservation supervision of Pingjiang pumped storage power station in Hunan
投稿时间:2020-08-11  
DOI:
中文关键词: 抽水蓄能电站  卫星遥感  多星协同  水土保持  湖南
英文关键词: pumped storage power station  satellite remote sensing  multi-satellite collaboration  water and soil conservation  Hunan Province
基金项目:本文受国家电网公司科技项目(SGXYKJ-2019-156)资助。
作者单位
李国和 国网新源控股有限公司北京 100761 
高国庆 国网新源控股有限公司北京 100761 
左程 湖南平江抽水蓄能有限公司湖南岳阳 414500 
钟龙 湖南平江抽水蓄能有限公司湖南岳阳 414500 
李雷娟 紫光软件系统有限公司北京 100084 
宋盼盼 紫光软件系统有限公司北京 100084 
刘新 紫光软件系统有限公司北京 100084 
陈晓枫 国网经济技术研究院有限公司北京 102209 
摘要点击次数: 1116
全文下载次数: 485
中文摘要:
      抽水蓄能电站施工占地范围大,地形复杂,水保监管难度大。而传统水保监测手段主要依靠人工现场调查,耗时耗力,急需引入一种新的技术手段进行抽水蓄能电站水土保持监管。在国家放管服政策实施下,利用以高分系列卫星为主,结合 World View遥感卫星的多星协同技术,对平江抽水蓄能电站施工阶段进行扰动面积、施工道路及水保措施的监测。结果表明,利用多星协同技术进行平江抽水蓄能电站多频次水土保持监管,获取的扰动面积提取精度在 95%以上,施工道路长度提取精度在 95%以上,宽度提取精度在 90%以上,均满足工程需要。此外,多星协同技术能及时发现施工现场水保问题并解决,有效减少安全隐患,保护水土,保障电站施工顺利进行,对抽水蓄能电站安全建设具有一定的指导意义。
英文摘要:
      The construction of pumped storage power station covers a large area,and the terrain is complex,so it is difficult to supervise the water and soil conservation However,the traditional monitoring methods of water and soil conservation mainly rely on manual field investigation,which is time-consuming and labor-intensive Therefore,it is urgent to introduce a new technical means for water and soil conservation supervision in pumped storage power station Under the implementation of the national policies regarding optimizing services of governments,the disturbance range,construction road and water and soil conservation measures of Pingjiang pumped storage power station during the construction stage are monitored by multi-satellite collaboration technology including Gaofen-series satellites and World View remote sensing satellite The results show that using multi-satellite collaboration technology for multi-frequency water and soil conservation supervision in Pingjiang pumped storage power station,the obtained extraction accuracy of disturbance area is more than 95%,construction road length is more than 95%,and the width is more than 90%,which all satisfy the needs of the project In addition, it can timely nd and solve the problems of water and soil conservation at the construction site,effectively reduce potential safety hazards,protect water and soil,and ensure the smooth progress of power station construction,which has certain guiding signi cance for the safe construction of pumped-storage power stations