文章摘要
李杨.山水林田湖草生态保护修复治理工程预算定额标准建设探析[J].矿产勘查,2022,13(11):1725-1732
山水林田湖草生态保护修复治理工程预算定额标准建设探析
Analysis on the construction of budget norm standard for ecological protection and restoration of mountains, waters, forests, farmland, lakes and grassland
投稿时间:2022-06-14  
DOI:10.20008/j.kckc.202211017
中文关键词: 山水林田湖草  系统治理  预算定额标准  生态保护
英文关键词: holistic approach to conserving mountains,rivers,forests,farmlands,lakes,and grassland  governance system standard of budget quota  ecological protection
基金项目:本文受“河南省南太行地区山水林田湖草生态保护修复工程”(财建〔2018〕627号)项目资助。
作者单位
李杨 河南技师学院, 河南 郑州 450000 
摘要点击次数: 1350
全文下载次数: 653
中文摘要:
      20世纪90年代以来,我国经济持续高速增长,伴随而来的是对矿产、森林、土地、水资源等自然资源过度的开发利用,导致我国部分地区生态系统严重退化。为从根本解决生态退化问题,国家自2016年以来,在全国范围内选择25个试点省份,先后组织开展了一系列山水林田湖草生态保护修复系统治理工程,拟由原来的单项工程整治转变为以山水林田湖草等多种自然资源要素构成的自然生态恢复治理为导向的保护修复。然而,由于目前国家没有制定统一的山水林田湖草生态保护修复治理工程预算定额标准,导致在工程调查、勘查、设计、施工、监理、验收、绩效评价等多个环节出现无统一依据可循、工程预算编制不科学、项目推进迟缓、工程无法验收、绩效无法合理评价等一系列问题的出现。作者从参与该项工程的具体实践入手,对制定山水林田湖草生态保护修复治理工程预算定额标准进行深入分析,提出了尽快研制山水林田湖草生态保护修复治理工程预算定额标准的建议,以促进该工程尽快推进实施。
英文摘要:
      China has experinced rapid economic growth since 1990s, which accompanied by excessive exploitation and construction of natural resources such as minerals, forests, land and water resources has, resulting in serious degradation of ecosystem in some areas In order to fundamentally address the problem of ecological degradation, the state has, since 2016, organized and carried out a series of pilot projects to improve the ecological protection and restoration system of mountains, rivers, forests, farmland, lakes and grasslands in 25 pilot provinces nationwide. It is planned to change from the original single engineering renovation to the natural ecological restoration and management oriented by a variety of natural resource elements such as mountains, rivers, forests, fields, lakes and grasses. However, because the country has no unified mountains, waters, forests, farmland, lakes and grassland protection and restoration of the ecological management engineering budget quota standards, resulting in engineering survey, exploration, design, construction, supervision, acceptance, performance evaluation, and other links appear without a unified basis, project budgeting is not scientific, project advancing slowly, project acceptance, performance can not be reasonably evaluated and a series of problems. The author starts with the concrete practice of participation in the project, to formulate mountains, waters, forests, farmland, lakes and grassland protection and restoration of the ecological management engineering budget quota standards for in-depth analysis, put forward the development as soon as possible mountains, waters, forests, farmland, lakes and grassland protection and restoration of the ecological management engineering budget quota standard advice, in order to promote the project to promote implementation of as soon as possible.
查看全文   查看/发表评论  下载PDF阅读器
关闭