文谟云,谢万兵.矿井涌水量预算方法探讨[J].矿产勘查,2024,15(S2):114-117 |
矿井涌水量预算方法探讨 |
Discussion on the budget method for mine water inflow |
投稿时间:2024-06-30 |
DOI:10.20008/j.kckc.2024s2015 |
中文关键词: 矿井 涌水量 预算方法 |
英文关键词: mine water inflow budget method |
基金项目: |
|
摘要点击次数: 7 |
全文下载次数: 0 |
中文摘要: |
矿井涌水量是煤矿开发建设的重要技术条件之一,对煤矿的设计开采、确定防排水措施及设备选型至关重要。本文主要针对煤矿矿坑涌水量预算方法进行探讨,通过对大井法与比拟法预算结果的分析对比,综合认为大井法预算涌水量结果更合适。研究结果可为矿井防排水措施及设备选型提供依据,同时为周 |
英文摘要: |
The water inflow of mines is one of the important technical conditions for coal mine developmentand construction,which is crucial for the design and mining of coal mines,the determination of waterproof and drainage measures,and equipment selection. This article mainly discusses the budgeting method for water inflow in coal mines,analyzes and compares the budgeting results of the large well method and the comparative method,and finds that the large well method is more suitable for estimating water inflow. Provide a basis for mine waterproofingand drainage measures and equipment selection,as well as a reference for predicting water inflow in surrounding mines of the same type. |
查看全文
查看/发表评论 下载PDF阅读器 |
关闭 |