文章摘要
蔚波,王海东,刘甜甜,韩强,李福程,李锦元,展学良.邵寨煤矿地下水流数值模拟及涌水量预测[J].矿产勘查,2024,15(S2):687-690
邵寨煤矿地下水流数值模拟及涌水量预测
Numerical simulation of groundwater flow and prediction of water inflow in Shaozhai Coal Mine
投稿时间:2024-05-16  
DOI:10.20008/j.kckc.2024s2089
中文关键词: 涌水量预测  数值模拟  渗透系数
英文关键词: prediction of water inflow  numerical simulation  permeability coefficient
基金项目:本文受陕西省教育厅自然科学专项基金(21JK0754)资助。
作者单位
蔚波 中煤科工西安研究院集团有限公司陕西西安 710076 
王海东 山东能源西北矿业邵寨煤业有限公司甘肃平凉 744400 
刘甜甜 西安科技大学陕西西安 710054 
韩强 山东能源西北矿业邵寨煤业有限公司甘肃平凉 744400 
李福程 山东能源西北矿业邵寨煤业有限公司甘肃平凉 744400 
李锦元 山东能源西北矿业邵寨煤业有限公司甘肃平凉 744400 
展学良 山东能源西北矿业邵寨煤业有限公司甘肃平凉 744400 
摘要点击次数: 0
全文下载次数: 0
中文摘要:
      数值模拟法在模拟矿井涌水量随采掘变化方面具有较高的准确性。本文在构建邵寨井田 5#煤层顶板至洛河组的三维地下水流数值模型的基础上,根据矿井涌水量台账反算开采后工作面上覆岩层的渗透系数,通过不断调整工作面上覆岩层渗透系数使得模型计算的工作面涌水量与实际工作面涌水量接近,使得模型的渗透系数更符合受扰动后上覆岩层的渗透系数,且能够确定导水裂隙带发育的层位,反算结果表明开采 5#煤层形成的导水裂隙带并未导通洛河组,因此,矿井涌水量偏小。回采 1202工作面时矿井涌水量预测为 88 m3/h;回采 1503工作面时矿井涌水量预测为 121 m3/h;回采 2501工作面时矿井涌水量预测为 137 m3/h;回采 1505工作面时矿井涌水量预测为 157 m3/h;回采 1203工作面时矿井涌水量预测为 179 m3/h;回采 2503工作面时矿井涌水量预测为 187 m3/h。
英文摘要:
      The numerical simulation method has high accuracy in simulating the variation of mine water inflowwith excavation. On the basis of constructing a three-dimensional numerical model of groundwater flow from the roof of the 5#coal seam to the Luohe Formation in the Shaozhai mine field,the permeability coefficient of the overly. ing strata on the mining face is calculated based on the mine water inflow ledger. By continuously adjusting thepermeability coefficient of the overlying strata on the working face,the calculated water inflow of the working face is close to the actual water inflow of the working face,making the permeability coefficient of the model more in linewith the permeability coefficient of the disturbed overlying strata,And it is possible to determine the developmentlayer of the water conducting fracture zone. The back calculation results indicate that the water conducting fracturezone formed by mining the 5 #coal seam did not lead to the Luohe Formation,therefore,the water inflow of the mine is relatively small. The predicted water inflow of the mine during mining face 1202 is 88 m3/h;The predicted water inflow of the mine during the mining of 1503 working face is 121 m3/h;The predicted water inflow of the mine during the extraction of the 2501 working face is 137 m3/h;The predicted water inflow of the mine during the min. ing of 1505 working face is 157 m3/h;The predicted water inflow of the mine during the mining of 1203 working face is 179 m3/h;The predicted water inflow of the mine during the extraction of the 2503 working face is 187 m3/h.
查看全文   查看/发表评论  下载PDF阅读器
关闭