文章摘要
刘京楠,王喜军,程立群,王玉珏,徐一鸣.威胁对象分散型泥石流沟谷灾害特征及防治对策——以青龙县二道沟泥石流为例[J].矿产勘查,2024,15(S2):709-718
威胁对象分散型泥石流沟谷灾害特征及防治对策——以青龙县二道沟泥石流为例
Disaster characteristics and prevention measures of debris flow gully disaster with dispersed threat objects: Take Erdaogou debris flow in Qinglong County as an example
投稿时间:2023-11-29  
DOI:10.20008/j.kckc.2024s2092
中文关键词: 泥石流  形成条件  灾害特征  参数分析  防治对策
英文关键词: debris flow  forming conditions  hazard characteristics  parameter analysis  preventive measures
基金项目:
作者单位
刘京楠 河北省地质矿产勘查开发局第八地质大队河北秦皇岛 066000 
王喜军 河北柳江盆地地质遗迹国家级自然保护区管理中心河北秦皇岛 066000 
程立群 河北省地质矿产勘查开发局第八地质大队河北秦皇岛 066000
河北宝地建设工程有限公司河北秦皇岛 066000 
王玉珏 河北宝地建设工程有限公司河北秦皇岛 066000 
徐一鸣 河北省地质矿产勘查开发局第八地质大队河北秦皇岛 066000
河北宝地建设工程有限公司河北秦皇岛 066000 
摘要点击次数: 0
全文下载次数: 0
中文摘要:
      青龙满族自治县为秦皇岛市地质灾害易发多发县,其中以泥石流地质灾害最为常见。本文以青龙满族自治县二道沟泥石流为例,通过实地调查与综合分析,总结了其地质特征,提出了防治对策。研究表明,该泥石流沟所在位置沟谷发育、地形起伏大,物源来源于坡面残坡积及沟底冲洪积物,水源主要为大气降水。该泥石流沟为老泥石流沟,间歇性泥石流沟,易发程度为易发,总体上属暴雨沟谷型稀性泥石流。根据计算得出的泥石流流体重度、流速、流量、一次冲出量、一次固体冲出物质总质量等指标,提出了在研究区内设置雨量监测站的监测预警方案,以及固源 +排导相结合的综合工程治理方案。
英文摘要:
      Qinglong Manchu Autonomous County is a county prone to geological disasters in Qinhuangdao City,among which debris flow geological disasters are the most common. This article takes the Erdaogou debrisflow in Qinglong Manchu Autonomous County as an example. Through field investigation and comprehensive analysis,it summarizes its geological characteristics and puts forward prevention and control strategies. Researchshows that the debris flow gully is located in a location with developed ravines and undulating terrain. The source ofthe debris comes from residual slope accumulation on the slope and alluvial deposits at the bottom of the gully. Thewater source is mainly atmospheric precipitation. This debris flow gully is an old debris flow gully,an intermittent debris flow gully,and is prone to occur. Generally speaking,it is a rainstorm ravine type sparse water-rock flow. Based on the calculated debris flow fluid weight,flow velocity,flow rate,one-time flushing volume,one-time total mass of solid flushing materials and other indicators,a monitoring and early warning plan for setting up a rainfall monitoring station in the study area,as well as a solid source + drainage guide were proposed. Combined comprehensive engineering management plan.
查看全文   查看/发表评论  下载PDF阅读器
关闭